Home
These proposals involve introducing a continuous cycle route between East Reading and Twyford along the A4 Bath Road. This would comprise of both segregated cycle tracks and shared use paths. This would be achieved by taking space from grass verges and reallocating space from the carriageway.
Speed limits on the route would also be reduced and junctions at side roads improved to slow turning vehicles.